Solicitation Notification For: Cedar Rapids Flood Risk Management Project, Reach 1, Cedar Lake South Railyard (Hoth)Floodwall

Estimated Value: $5,000,000
Open 19 days left ILConstructionsolicitation
May 12, 2026
Jun 11, 2026 3:00 PM
Construction
solicitation
237990
...
AI Summary
This bid is for the construction of a floodwall as part of the Cedar Rapids Flood Risk Management Project, specifically Reach 1, Cedar Lake South Railyard (Hoth) Floodwall. The bid requires access to a plan set (Attachment J-2 Plan Set - VOL117 Railyard_Floodwall) that may not be fully available on SAM.gov.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Floodwall Construction 1 lot $4,500,000.00 $4,500,000.00 Construction
Site Preparation 1 lot $250,000.00 $250,000.00 Construction
Engineering and Design Services 1 lot $150,000.00 $150,000.00 Professional Services
Materials (Concrete, Steel, etc.) 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$5,000,000.00

Want the full details?

Sign up free to see the agency name, 2 documents, contact info, and the original bid posting link.

📎 B08_-_W912EK26BA002_Solicitation_with_Specs_20260512.pdf View
📎 Attachment_J-1__Wage_Determination_IA20260028.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in IllinoisConstruction BidsSOLICITATION BidsClosing Soon All Bids