WA NP MORA 11(1), Fryingpan Creek Bridge

Estimated Value: $5,000,000
Open 26 days left WAConstructionsolicitation
May 12, 2026
Jun 18, 2026 9:00 PM
Construction
solicitation
237310
AI Summary
This bid is for the construction of the Fryingpan Creek Bridge in WA NP MORA 11(1). See attached documents for detailed requirements.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Bridge Construction 1 each $4,000,000.00 $4,000,000.00 Construction
Site Preparation 1 lot $250,000.00 $250,000.00 Construction
Engineering and Design Services 1 lot $250,000.00 $250,000.00 Construction
Materials (Concrete, Steel, etc.) 1 lot $300,000.00 $300,000.00 Construction
Environmental Mitigation 1 lot $200,000.00 $200,000.00 Construction
Estimated Bid Value$5,000,000.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 Physical_Data_WA_NP_MORA_11_1_.zip View
📎 mora11-1_plans.pdf View
📎 IFB_69056726B000001.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in WashingtonConstruction BidsSOLICITATION BidsClosing Soon All Bids