| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Site Preparation for Asphalt Millings (removal of grass, vegetation, and unsuitable sub-base materials) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Asphalt Millings Installation (4-6 inches) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Estimated Bid Value | $15,000.00 | ||||
Sign up free to see the agency name, contact info, and the original bid posting link.
Sign Up Free →