Replace Boiler Feed and Condensate Lines 610A4-26-202

Estimated Value: $75,000
Open 31 days left OHConstructionsolicitation
May 13, 2026
Jun 23, 2026 8:30 PM
Construction
solicitation
238220
...
AI Summary
This bid is for a contractor to replace boiler feed lines, condensate lines, associated valves, piping, and other materials inside Building 2, including demolition and insulation.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Demolition of Existing Boiler Feed and Condensate Piping 1 lot $5,000.00 $5,000.00 Construction
Boiler Feed Lines (Piping) 100 feet $50.00 $5,000.00 Construction
Condensate Lines (Piping) 100 feet $40.00 $4,000.00 Construction
Associated Valves (Boiler Feed) 10 each $200.00 $2,000.00 Construction
Associated Valves (Condensate) 10 each $150.00 $1,500.00 Construction
Piping Insulation 200 feet $25.00 $5,000.00 Construction
Labor for Installation 400 hours $100.00 $40,000.00 Construction
Equipment Rental (Welding, Lifting, etc.) 1 lot $5,000.00 $5,000.00 Construction
Supervision 1 lot $7,500.00 $7,500.00 Construction
Estimated Bid Value$75,000.00

Want the full details?

Sign up free to see the agency name, 7 documents, contact info, and the original bid posting link.

📎 Attachment_I_-_Wage_Determination.pdf View
📎 36C25026Q0519.pdf View
📎 Attachment_VI_-_Specs.pdf View
+4 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in OhioConstruction BidsSOLICITATION BidsClosing Soon All Bids