J061--PROJECT 675-25-804, Bid-Build (BB) Install Water Tower Projector System at Lake Nona

Estimated Value: $500,000
Open 23 days left FLConstructionsolicitation
May 15, 2026
Jun 15, 2026 3:00 PM
Construction
solicitation
238210
AI Summary
This bid is for the construction and installation of a projector system on a water tower at Lake Nona. The project is a bid-build type.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Projector System 1 lot $150,000.00 $150,000.00 Construction
Water Tower Mounting Structure 1 lot $75,000.00 $75,000.00 Construction
Electrical Wiring and Connections 1 lot $50,000.00 $50,000.00 Construction
Control System and Software 1 lot $25,000.00 $25,000.00 Construction
Installation Labor 1 lot $100,000.00 $100,000.00 Construction
Project Management 1 lot $50,000.00 $50,000.00 Construction
Testing and Commissioning 1 lot $50,000.00 $50,000.00 Construction
Estimated Bid Value$500,000.00

Want the full details?

Sign up free to see the agency name, 12 documents, contact info, and the original bid posting link.

📎 ATTACHMENT_11_-_Limitation_of_Subcontracting_Certificate.pdf View
📎 ATTACHMENT_10_-_Base_Offer_Price_Breakdown.xlsx View
📎 ATTACHMENT_9_-_EMR.pdf View
+9 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in FloridaConstruction BidsSOLICITATION BidsClosing Soon All Bids