| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Parking Lot Demolition and Removal | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Site Preparation (Grading, Excavation) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Base Course Installation (Gravel, Aggregate) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Asphalt Paving | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Concrete Curbing and Sidewalk Installation | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Parking Space Striping and Marking | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Signage Installation (Parking Signs, Directional Signs) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Drainage Improvements (Culverts, Catch Basins) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Erosion Control Measures (Seeding, Mulching) | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Project Management and Supervision | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Estimated Bid Value | $500,000.00 | ||||