| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Barracks Demolition | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Site Preparation | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Barracks Construction (Materials and Labor) | 1 | lot | $120,000.00 | $120,000.00 | Construction |
| Plumbing Installation | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Electrical Installation | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| HVAC Installation | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Interior Finishing (Walls, Flooring, Ceilings) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Estimated Bid Value | $175,000.00 | ||||
Sign up free to see the agency name, 9 documents, contact info, and the original bid posting link.