| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Excavation of roadway fill and slide debris | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Installation of drainage pipe | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Backfilling with light loose riprap | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Backfilling with quarry spalls | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Installation of drainage headwall | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Construction of maintenance foot path | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Construction of vehicle access | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Hot Mix Asphalt (HMA) saw cut and repair | 1 | lot | $260,000.00 | $260,000.00 | Construction |
| Estimated Bid Value | $500,000.00 | ||||