| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Site Preparation | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Foundation Construction | 1 | lot | $750,000.00 | $750,000.00 | Construction |
| Building Structure Construction (Steel/Concrete) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Exterior Walls and Roofing | 1 | lot | $800,000.00 | $800,000.00 | Construction |
| Interior Construction (Walls, Flooring, Ceilings) | 1 | lot | $600,000.00 | $600,000.00 | Construction |
| HVAC System Installation | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Electrical System Installation | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Plumbing System Installation | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Fire Protection System Installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Estimated Bid Value | $5,000,000.00 | ||||
Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.