| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Electrical Subpanel (Replacement) | 1 | each | $3,000.00 | $3,000.00 | Construction |
| Electrical Labor (Installation) | 80 | hour | $100.00 | $8,000.00 | Construction |
| Electrical Materials (Wiring, Conduit, Connectors, etc.) | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Equipment Rental (Lifts, Tools) | 1 | lot | $1,000.00 | $1,000.00 | Construction |
| Engineering Services | 1 | lot | $500.00 | $500.00 | Construction |
| Quality Control and Safety Oversight | 1 | lot | $500.00 | $500.00 | Construction |
| Estimated Bid Value | $15,000.00 | ||||
Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.