This bid is for the rehabilitation of the Beaver Lake Dam in the Mark Twain National Forest, including drawdown improvements, removal of the existing overflow conduit, and spillway erosion repair with riprap.
Line Items
Item
Qty
Unit
Est. Unit Price
Est. Total
Category
Draw Down Water Level Improvements
1
lot
$50,000.00
$50,000.00
Construction
Clearing and Grubbing
1
lot
$25,000.00
$25,000.00
Construction
Excavation and Removal of Existing Overflow Conduit and Appurtenances
1
lot
$250,000.00
$250,000.00
Construction
Spillway Erosion Repair with Riprap
1
lot
$425,000.00
$425,000.00
Construction
Estimated Bid Value
$750,000.00