Mark Twain NF Beaver Lake Dam Rehabilitation

Estimated Value: $750,000
Open 38 days left DCConstructionrfp
May 22, 2026
Jun 30, 2026 4:00 PM
Construction
rfp
237310
AI Summary
This bid is for the rehabilitation of the Beaver Lake Dam in the Mark Twain National Forest, including drawdown improvements, removal of the existing overflow conduit, and spillway erosion repair with riprap.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Draw Down Water Level Improvements 1 lot $50,000.00 $50,000.00 Construction
Clearing and Grubbing 1 lot $25,000.00 $25,000.00 Construction
Excavation and Removal of Existing Overflow Conduit and Appurtenances 1 lot $250,000.00 $250,000.00 Construction
Spillway Erosion Repair with Riprap 1 lot $425,000.00 $425,000.00 Construction
Estimated Bid Value$750,000.00

Want the full details?

Sign up free to see the agency name, 2 documents, contact info, and the original bid posting link.

📎 FP-14.pdf View
📎 12363N26Q4161_RFQ--.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids