Z1NB--Boiler replacement

Estimated Value: $1,500,000
Open 20 days left VAConstructionsolicitation
May 22, 2026
Jun 12, 2026 1:00 PM
Construction
solicitation
236220
AI Summary
This bid is for the replacement of a boiler system at the Durham VHAMC, including work in multiple buildings and parking areas. It encompasses the removal of the old boiler and installation of a new one, along with any necessary modifications to the associated infrastructure.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Boiler Removal 1 each $50,000.00 $50,000.00 Construction
New Boiler System (including installation) 1 each $800,000.00 $800,000.00 Construction
Temporary Boiler System (Rental/Lease) 1 lot $150,000.00 $150,000.00 Construction
Piping and Plumbing Modifications 1 lot $100,000.00 $100,000.00 Construction
Electrical Modifications 1 lot $75,000.00 $75,000.00 Construction
Control System Integration 1 lot $50,000.00 $50,000.00 Construction
Site Preparation and Restoration (Parking Lots, etc.) 1 lot $25,000.00 $25,000.00 Construction
Engineering and Design Services 1 lot $100,000.00 $100,000.00 Professional Services
Permitting and Inspections 1 lot $50,000.00 $50,000.00 Construction
Project Management 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name, 6 documents, contact info, and the original bid posting link.

📎 Amend_0002_RFI_questions_and_sign_in_sheet_05222026.pdf View
📎 S02_36C24626B0020_1__04292026.pdf View
📎 36C24626B0020_Amend_0001__05012026.pdf View
+3 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in VirginiaConstruction BidsSOLICITATION BidsClosing Soon All Bids