STOPLOG LIFTING BEAM MODIFICATION PROJECT - Colora

Estimated Value: $25,000
Open 28 days left AZGeneral / Otherrfp
May 23, 2026
Jun 20, 2026 12:00 AM
General / Other
rfp
332312
AI Summary
This bid is for the modification of a stoplog lifting beam for the Colorado River Agency. The project likely involves structural modifications, potentially including welding, fabrication, and engineering services.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Stoplog Lifting Beam Modification 1 each $15,000.00 $15,000.00 Construction
Engineering Design and Analysis 1 lot $5,000.00 $5,000.00 Professional Services
Welding and Fabrication Services 1 lot $3,000.00 $3,000.00 Construction
Materials (Steel, Fasteners, etc.) 1 lot $2,000.00 $2,000.00 Construction
Estimated Bid Value$25,000.00

Want the full details?

Sign up free to see the agency name, 9 documents, contact info, and the original bid posting link.

📎 Sol_140A1126R0005.pdf View
📎 SF-24_Bid_Bond_Form.pdf View
📎 SF-25_Performance_Bond_Form.pdf View
+6 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in ArizonaGeneral / Other BidsRFP BidsClosing Soon All Bids