| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Pavement Repair (Asphalt) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Pavement Maintenance (Asphalt) | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Pavement Repair (Concrete) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Pavement Maintenance (Concrete) | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Crack Sealing | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Line Striping | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Sign Repair/Replacement | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Curb Repair/Replacement | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| ADA Ramp Installation/Repair | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Pavement Milling | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Asphalt Overlay | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| Traffic Control Services | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Engineering and Design Services | 1 | lot | $20,000.00 | $20,000.00 | Professional Services |
| Project Management Services | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Estimated Bid Value | $500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 9 documents, contracting-officer contacts and AI response outlines.