| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Excavation of roadway fill and slide debris | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Installation of drainage pipe | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| Backfilling with light loose riprap | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Backfilling with quarry spalls | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Installation of drainage headwall | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Construction of maintenance footpath | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Construction of vehicle access | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Hot Mix Asphalt (HMA) saw cut and repair | 1 | lot | $185,000.00 | $185,000.00 | Construction |
| Estimated Bid Value | $500,000.00 | ||||