| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Surface Preparation for Painting (Control Tower Chamber Equipment) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Painting of Control Tower Chamber Equipment | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Cleanup and Disposal of Waste Materials | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Project Management and Supervision | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Estimated Bid Value | $25,000.00 | ||||
Sign up free to see the agency name, contact info, and the original bid posting link.
Sign Up Free →