| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Creek Bed Excavation and Grading | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Streambank Stabilization Materials (e.g., riprap, coir logs) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Native Plant Installation | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Erosion and Sediment Control Measures (e.g., silt fences, erosion blankets) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Equipment Rental (e.g., excavator, bulldozer) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Labor Costs | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Estimated Bid Value | $50,000.00 | ||||