Distribution Getaway Duct Bank Bore at East Village subst

Estimated Value: $1,120,000
Closing Soon 4 days left TexasConstructionrfq
Jun 27, 2026
Jul 9, 2026 12:00 AM
Construction
rfq
237130
AI Summary
This bid is for the construction of an underground duct bank system for Austin Energy, involving trenchless boring, open-cut trenching, manhole installation, and associated site restoration.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
36-inch jack and bore with 12-5 inch carrier pipes (grouted within casing pipe) in ground water conditions 342 linear foot $1,500.00 $513,000.00 Construction
12-5 inch open cut duct bank 386 linear foot $800.00 $308,800.00 Construction
2-5 inch open cut duct bank 79 linear foot $600.00 $47,400.00 Construction
12'x12' manhole 2 each $100,000.00 $200,000.00 Construction
Erosion and sedimentation control and revegetation 1 lot $50,000.00 $50,000.00 Construction
Estimated Bid Value$1,120,000.00

Want the full details?

Sign up free to see the agency name, contact info, and the original bid posting link.

Sign Up Free →

Related Bids

Browse More Bids

Bids in TexasConstruction BidsRFQ BidsClosing Soon All Bids