McDuffie Terminal Dock 2 Refurbishment – Supply of Rail and Associated Components

Estimated Value: $250,000
Closing Soon 4 days left AlabamaGeneral / Otherrfq
Jun 28, 2026
Jul 9, 2026 12:00 AM
General / Other
rfq
332312
AI Summary
This bid is for the supply of rail and associated components required for the refurbishment of Dock 2 at the McDuffie Terminal.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Rail (e.g., ASCE 85, 100, 115, or similar heavy-duty crane rail) 1000 linear foot $150.00 $150,000.00 Construction
Rail Clips and Fasteners (e.g., bolted clips, weldable clips, anchor bolts, nuts, washers) 500 set $75.00 $37,500.00 Construction
Rail Pads/Insulators (e.g., rubber or synthetic pads for vibration dampening and electrical insulation) 1000 linear foot $25.00 $25,000.00 Construction
Rail Joint Bars/Splice Bars 50 each $200.00 $10,000.00 Construction
Rail Anchors/Shoulders (if applicable for specific rail type) 200 each $40.00 $8,000.00 Construction
Welding Consumables for Rail Installation (e.g., electrodes, filler wire) 1 lot $5,000.00 $5,000.00 Construction
Miscellaneous Hardware and Components (e.g., shims, leveling plates, specialized bolts) 1 lot $14,500.00 $14,500.00 Construction
Estimated Bid Value$250,000.00

Want the full details?

Sign up free to see the agency name, contact info, and the original bid posting link.

Sign Up Free →

Related Bids

Browse More Bids

Bids in AlabamaGeneral / Other BidsRFQ BidsClosing Soon All Bids