RFP for CTSI EV fast charging network project

Estimated Value: $6,400,000
Archived OregonConstructionrfq
This bid is closed — responses were due July 15, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Oregon →
Jun 28, 2026
Jul 15, 2026 12:00 AM
Construction
rfq
237130
AI Summary
The Confederated Tribes of Siletz Indians (CTSI) is seeking proposals from qualified firms to design and build a regional electric vehicle (EV) charging network. This network will consist of up to 32 DC Fast Charging ports across Lincoln County, Oregon, serving various vehicle types including public, tribal government, fleet, transit, and emergency response vehicles. Firms should propose turnkey design-build services for this project.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Turnkey Design-Build Services for EV Fast Charging Network 1 project $6,400,000.00 $6,400,000.00 Construction
DC Fast Charging Port (Level 3 EV Charger) 32 each $50,000.00 $1,600,000.00 Energy
EV Charging Station Installation (including site prep, electrical work, permitting) 32 each $100,000.00 $3,200,000.00 Construction
Project Management and Engineering Services for EV Charging Network 1 lot $1,000,000.00 $1,000,000.00 Professional Services
Network Integration and Software for EV Charging Stations 1 lot $600,000.00 $600,000.00 IT Services
Estimated Bid Value$6,400,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.

📎 Tribal-Plan-of-Operations-04-17-2025.pdf View
📎 RFP_EVCharging_CTSI2026.pdf View
📎 RFP-Bullpen-Repaving-Project-2026.pdf View
+1 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in OregonConstruction BidsRFQ BidsClosing Soon All Bids