RFP for Swan Ave., Road Frontage/Road Resurfacing Improvements and Stormwater Improvement Project

Estimated Value: $1,500,000
Open 12 days left OregonConstructionrfq
Jun 28, 2026
Jul 17, 2026 12:00 AM
Construction
rfq
237310
AI Summary
The Confederated Tribes of Siletz Indians are seeking proposals from qualified contractors for road construction, roadway frontage improvements, and stormwater infrastructure improvements along Swan Avenue in Siletz, Oregon. The project aims to enhance roadway safety, pedestrian accessibility, stormwater management, and overall site resilience, supporting future tribal development. Contractors need to provide all necessary labor, materials, equipment, supervision, permits, and traffic control.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Road Frontage Improvements (labor, materials, equipment, supervision, permits, traffic control) 1 lot $400,000.00 $400,000.00 Construction
Road Resurfacing Improvements (labor, materials, equipment, supervision, permits, traffic control) 1 lot $600,000.00 $600,000.00 Construction
Stormwater Infrastructure Improvements (labor, materials, equipment, supervision, permits, traffic control) 1 lot $500,000.00 $500,000.00 Construction
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name, 4 documents, contact info, and the original bid posting link.

📎 Tribal-Plan-of-Operations-04-17-2025.pdf View
📎 RFP_EVCharging_CTSI2026.pdf View
📎 RFP-Bullpen-Repaving-Project-2026.pdf View
+1 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in OregonConstruction BidsRFQ BidsClosing Soon All Bids