| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| General Construction Services for Controlled Area Conversion | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Demolition and Site Preparation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| HVAC System Upgrades/Modifications for Controlled Environment | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Electrical System Upgrades/Modifications for Controlled Environment | 1 | lot | $125,000.00 | $125,000.00 | Construction |
| Specialized Security Doors and Frames | 10 | each | $8,000.00 | $80,000.00 | Security |
| Access Control System Installation (CAC/Biometric Readers) | 1 | lot | $75,000.00 | $75,000.00 | Security |
| Intrusion Detection System (IDS) Installation | 1 | lot | $60,000.00 | $60,000.00 | Security |
| CCTV Surveillance System Installation | 1 | lot | $40,000.00 | $40,000.00 | Security |
| Sound Attenuation and RF Shielding Materials/Installation | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Fire Suppression System Modifications/Upgrades | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Estimated Bid Value | $1,250,000.00 | ||||
Sign up free to see the agency name, 21 documents, contact info, and the original bid posting link.