| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| General Construction Services for Controlled Area Conversion | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Demolition and Site Preparation | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| HVAC System Upgrades/Modifications for Controlled Environment | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Electrical System Upgrades/Modifications for Controlled Environment | 1 | lot | $125,000.00 | $125,000.00 | Construction |
| Access Control System Installation/Integration | 1 | lot | $50,000.00 | $50,000.00 | Security |
| Security Camera System Installation/Integration | 1 | lot | $25,000.00 | $25,000.00 | Security |
| Specialized Doors and Hardware for Controlled Access | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Interior Finishes (Flooring, Walls, Ceilings) for Controlled Area | 1 | lot | $45,000.00 | $45,000.00 | Construction |
| Estimated Bid Value | $1,500,000.00 | ||||
Sign up free to see the agency name, 23 documents, contact info, and the original bid posting link.