| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Maintenance Dredging of Unclassified Material (Base) | 3298000 | cubic yards | $18.00 | $59,364,000.00 | Construction |
| Maintenance Dredging of Unclassified Material (Option) | 1180000 | cubic yards | $13.00 | $15,340,000.00 | Construction |
| Disposal of Dredged Material (Base) | 3298000 | cubic yards | — | — | Construction |
| Disposal of Dredged Material (Option) | 1180000 | cubic yards | — | — | Construction |
| Estimated Bid Value | $74,760,000.00 | ||||
Sign up free to see the agency name, 4 documents, contact info, and the original bid posting link.