| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Reservoir Embankment Rehabilitation (Base Work) | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Optional Line Item 1 (as per Attachment 4 drawings) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Optional Line Item 2 (as per Attachment 5 drawings) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Optional Line Item 3 (as per Attachment 6 drawings) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Estimated Bid Value | $2,500,000.00 | ||||
Sign up free to see the agency name, 10 documents, contact info, and the original bid posting link.