Mark Twain NF Beaver Lake Dam Rehabilitation

Archived Washington DCConstructionrfp
This bid is closed — responses were due July 13, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Washington DC →
Jul 2, 2026
Jul 13, 2026 4:00 PM
Construction
rfp
237310
AI Summary
This bid is for the rehabilitation of the Beaver Lake Dam at Mark Twain National Forest. The project involves drawing down water levels, clearing and grubbing, excavating and removing the existing overflow conduit and appurtenances, and repairing spillway erosion with riprap. To win, contractors will need to demonstrate their capability to perform these specific construction and earthwork tasks.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Draw down water levels 1 job Dam Rehabilitation
Clear and grub 1 job Site Preparation
Excavate and remove existing overflow conduit and appurtenances 1 job Dam Rehabilitation
Repair spillway erosion with riprap 1 job Dam Rehabilitation

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 2 documents, contracting-officer contacts and AI response outlines.

📎 12363N26Q4161_RFQ_Amendment.pdf View
📎 FP-14.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids