Silver Lake Restroom Roof Replacement

Estimated Value: $35,000
Open 25 days left UtahConstructionrfp
Jul 2, 2026
Jul 29, 2026 11:00 PM
Construction
rfp
238160
AI Summary
This bid is for the removal and replacement of a timber-framed roof structure on the Silver Lake restroom, which was damaged in winter 2023.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Removal of existing timber framed roof structure 1 lot $5,000.00 $5,000.00 Construction
Protection of existing amenities during construction 1 lot $2,000.00 $2,000.00 Construction
Replacement of timber framed roof structure (materials and labor) 1 lot $25,000.00 $25,000.00 Construction
Project management and supervision for roof replacement 1 lot $3,000.00 $3,000.00 Professional Services
Estimated Bid Value$35,000.00

Want the full details?

Sign up free to see the agency name, 4 documents, contact info, and the original bid posting link.

📎 C04_1240LT26Q0120.pdf View
📎 C04_SOW_1240LT26Q0120.docx View
📎 C04_Drawings_1240LT26Q0120.pdf View
+1 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in UtahConstruction BidsRFP BidsClosing Soon All Bids