| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design-Bid-Build (DBB) Services for Battle Staff Training Facility | 1 | lot | $35,000,000.00 | $35,000,000.00 | Construction |
| Architectural and Engineering Design Services for Battle Staff Training Facility | 1 | lot | $3,500,000.00 | $3,500,000.00 | Professional Services |
| Construction of Two-Story Battle Staff Training Facility Building | 1 | lot | $31,500,000.00 | $31,500,000.00 | Construction |
| Site Preparation and Earthwork | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Foundation Construction | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Structural Framing (Steel/Concrete) | 1 | lot | $4,000,000.00 | $4,000,000.00 | Construction |
| Exterior Envelope (Walls, Roofing, Windows, Doors) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Construction |
| Interior Finishes (Flooring, Ceilings, Walls, Paint) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| HVAC System Installation | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Plumbing System Installation | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Electrical System Installation (Power, Lighting) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Fire Protection System Installation | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Telecommunications and Data Infrastructure | 1 | lot | $2,000,000.00 | $2,000,000.00 | Telecommunications |
| Security System Installation (Access Control, CCTV) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Security |
| Specialized Training Room Equipment and Audiovisual Systems | 1 | lot | $2,000,000.00 | $2,000,000.00 | IT Hardware |
| Exterior Site Work (Paving, Landscaping, Utilities Connections) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Estimated Bid Value | $35,000,000.00 | ||||