Y--Steamboat Rock State Park Shoreline Stabilization

Estimated Value: $350,000
Open 15 days left IdahoConstructionsolicitation
Jul 6, 2026
Jul 22, 2026 5:00 PM
Construction
solicitation
237990
AI Summary
This bid is for construction services to stabilize the shoreline at Steamboat Rock State Park, preventing further erosion of the existing bank slopes.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Shoreline Erosion Control Design and Engineering 1 lot $30,000.00 $30,000.00 Professional Services
Site Preparation and Clearing (Vegetation Removal, Grading) 1 lot $25,000.00 $25,000.00 Construction
Riprap Installation (Rock Revetment) 1500 ton $150.00 $225,000.00 Construction
Geotextile Fabric Installation 5000 square yard $5.00 $25,000.00 Construction
Bioengineering Solutions (e.g., Live Stakes, Coir Logs) 1 lot $20,000.00 $20,000.00 Construction
Site Restoration and Revegetation (Native Plantings) 1 lot $15,000.00 $15,000.00 Construction
Project Management and Supervision 1 lot $10,000.00 $10,000.00 Professional Services
Estimated Bid Value$350,000.00

Want the full details?

Sign up free to see the agency name, 12 documents, contact info, and the original bid posting link.

📎 Sol_140R1026B0001_Amd_0002.pdf View
📎 Steamboat_Q_A_Log_0002.pdf View
📎 J_5__Specs_Revised__180_Pages__0002.pdf View
+9 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in IdahoConstruction BidsSOLICITATION BidsClosing Soon All Bids