AI Summary
This bid is for the installation of utility lines, including electrical, water, and sewer, and connections to existing lines and trailer pads at Upper Baker. The contract also includes optional items such as trenching, providing, and spreading gravel. To win, contractors will need to demonstrate their capability to perform utility installation and related earthwork.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Installation of Electrical Utility Lines 1 lot $30,000.00 $30,000.00 Construction
Installation of Water Utility Lines 1 lot $25,000.00 $25,000.00 Construction
Installation of Sewer Utility Lines 1 lot $30,000.00 $30,000.00 Construction
Connections to Existing Electrical Lines 1 lot $5,000.00 $5,000.00 Construction
Connections to Existing Water Lines 1 lot $5,000.00 $5,000.00 Construction
Connections to Existing Sewer Lines 1 lot $5,000.00 $5,000.00 Construction
Connections to Trailer Pads (Electrical, Water, Sewer) 1 lot $10,000.00 $10,000.00 Construction
Trenching (Option Item) 1 lot $5,000.00 $5,000.00 Construction
Providing and Spreading Gravel (Option Item) 1 lot $5,000.00 $5,000.00 Construction
Estimated Bid Value$115,000.00

Want the full details?

Sign up free to see the agency name, 9 documents, contact info, and the original bid posting link.

📎 C04_SF-1442_1240LT26Q0126.pdf View
📎 C04_1240LT26Q0126.docx View
📎 C04_SOW_1240LT26Q0126.docx View
+6 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in UtahConstruction BidsRFP BidsClosing Soon All Bids