| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Demolition and Waste Removal (existing bathroom fixtures and finishes) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Rough Carpentry (framing, blocking for new fixtures) | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Plumbing Fixture Installation (toilets, sinks, faucets, showers if applicable) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Electrical Work (lighting, outlets, ventilation fan installation) | 1 | lot | $7,500.00 | $7,500.00 | Construction |
| Flooring Installation (tile, vinyl, or other specified material) | 1 | lot | $6,000.00 | $6,000.00 | Construction |
| Wall Finishes (drywall repair, painting, tile installation) | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Ceiling Installation/Repair | 1 | lot | $3,000.00 | $3,000.00 | Construction |
| HVAC Work (ventilation system installation/upgrade) | 1 | lot | $4,000.00 | $4,000.00 | Construction |
| Doors and Hardware Installation | 1 | lot | $3,500.00 | $3,500.00 | Construction |
| Bathroom Accessories Installation (mirrors, grab bars, toilet paper holders, towel racks) | 1 | lot | $2,000.00 | $2,000.00 | Construction |
| Permits and Inspections | 1 | lot | $1,500.00 | $1,500.00 | Professional Services |
| Project Management and Supervision | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Cleanup and Final Touches | 1 | lot | $2,500.00 | $2,500.00 | Construction |
| Estimated Bid Value | $75,000.00 | ||||
Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.