| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Hard-wired LED pole luminaires (fixtures) | 30 | each | $1,500.00 | $45,000.00 | Construction |
| New pole foundations and installation | 30 | each | $1,000.00 | $30,000.00 | Construction |
| Electrical trenching and conduit installation | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Electrical wiring and connections | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Removal and disposal of existing solar-powered luminaires | 30 | each | $300.00 | $9,000.00 | Construction |
| Project management and supervision | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Site preparation and restoration | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Electrical permits and inspections | 1 | lot | $3,000.00 | $3,000.00 | Professional Services |
| Contingency (approx. 5%) | 1 | lot | $5,000.00 | $5,000.00 | Other |
| Estimated Bid Value | $150,000.00 | ||||
Sign up free to see the agency name, 1 document, contact info, and the original bid posting link.