Fire suppression system installation

Estimated Value: $150,000
Archived MinnesotaConstructionrfp
This bid is closed — responses were due August 6, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Minnesota →
Jul 8, 2026
Aug 6, 2026 5:00 PM
Construction
rfp
238220
AI Summary
This bid is for the design and installation of a new wet fire suppression system in Building 6418 at Moore Air Base, Texas, which currently lacks such a system.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Design of Wet Fire Suppression System 1 lot $20,000.00 $20,000.00 Construction
Installation of Wet Fire Suppression System (including materials and labor) 1 lot $120,000.00 $120,000.00 Construction
As-Built Drawings for Fire Suppression System 1 lot $10,000.00 $10,000.00 Construction
Estimated Bid Value$150,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.

📎 Attachment_2_Federal_Construction_Wage_Rates_Hidalgo_County.txt View
📎 Attachment_1_Statement_of_Work.docx View
📎 12639526Q0210.docx View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in MinnesotaConstruction BidsRFP BidsClosing Soon All Bids