Mark Twain NF Beaver Lake Dam Rehabilitation

Estimated Value: $225,000
Archived Washington DCConstructionrfp
This bid is closed — responses were due July 13, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Washington DC →
Jul 9, 2026
Jul 13, 2026 4:00 PM
Construction
rfp
237310
AI Summary
This bid is for the rehabilitation of the Beaver Lake Dam at Mark Twain National Forest, involving water level drawdown, site clearing, removal of the existing overflow conduit, and spillway erosion repair with riprap.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Water Level Drawdown Services (Beaver Lake Dam) 1 lot $25,000.00 $25,000.00 Construction
Clear and Grub Services (Dam Rehabilitation Area) 1 lot $20,000.00 $20,000.00 Construction
Excavation and Removal of Existing Overflow Conduit and Appurtenances 1 lot $80,000.00 $80,000.00 Construction
Spillway Erosion Repair with Riprap 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$225,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.

📎 Questions_and_Answers_for_Solicitation_12363N26Q4161.docx View
📎 12363N26Q4161_RFQ_Amendment.pdf View
📎 FP-14.pdf View
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids