| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Gate Motor System Replacement (including motor, controls, safety devices, etc.) | 1 | lot | $6,000.00 | $6,000.00 | Construction |
| Labor for Removal, Installation, Programming, Testing, Startup | 40 | hour | $85.00 | $3,400.00 | Construction |
| Supervision | 1 | lot | $800.00 | $800.00 | Professional Services |
| Materials (excluding main motor system, e.g., wiring, conduit, fasteners) | 1 | lot | $500.00 | $500.00 | Construction |
| Equipment (tools, lifts, etc.) | 1 | lot | $300.00 | $300.00 | Construction |
| Transportation to Kisatchie National Forest, LA | 1 | lot | $500.00 | $500.00 | Transportation |
| Permits and Fees | 1 | lot | $100.00 | $100.00 | Professional Services |
| Disposal of Existing Equipment | 1 | lot | $200.00 | $200.00 | Facilities |
| Surge Protection | 1 | each | $200.00 | $200.00 | Construction |
| Owner Training | 1 | lot | $200.00 | $200.00 | Professional Services |
| Warranties (included with equipment and labor) | 1 | lot | — | — | Other |
| Electrical Connections (minor wiring, conduit, junction boxes) | 1 | lot | $300.00 | $300.00 | Construction |
| Estimated Bid Value | $12,500.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.