| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| General Contractor Services (Project Management, Site Supervision, Coordination) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Demolition Services (Interior) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Framing (Metal Studs, Wood Framing) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Drywall Installation and Finishing | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Flooring Installation (various types, e.g., carpet, tile, hardwood) | 1 | lot | $120,000.00 | $120,000.00 | Construction |
| Painting and Wall Coverings | 1 | lot | $80,000.00 | $80,000.00 | Construction |
| HVAC System Installation/Upgrade | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Plumbing System Installation/Upgrade (fixtures, piping) | 1 | lot | $180,000.00 | $180,000.00 | Construction |
| Electrical System Installation/Upgrade (wiring, lighting, outlets) | 1 | lot | $250,000.00 | $250,000.00 | Construction |
| Fire Suppression System Installation/Upgrade | 1 | lot | $90,000.00 | $90,000.00 | Construction |
| Window and Door Installation/Replacement | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Millwork and Cabinetry Installation (custom and standard) | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Restroom Fixtures and Accessories | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Ceiling Systems Installation (e.g., acoustical tile, drywall ceilings) | 1 | lot | $70,000.00 | $70,000.00 | Construction |
| Life Safety and Security System Integration (access control, CCTV, alarms) | 1 | lot | $120,000.00 | $120,000.00 | Security |
| Data and Telecommunications Cabling Infrastructure | 1 | lot | $80,000.00 | $80,000.00 | Telecommunications |
| Architectural and Engineering Design Services (if not already completed) | 1 | lot | $200,000.00 | $200,000.00 | Professional Services |
| Permitting and Inspection Fees | 1 | lot | $40,000.00 | $40,000.00 | Professional Services |
| Contingency (approx. 10-15% of construction costs) | 1 | lot | $350,000.00 | $350,000.00 | Other |
| Site Logistics and Waste Management | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Finishes and Hardware (door hardware, trim, etc.) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Estimated Bid Value | $3,500,000.00 | ||||