| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Water Level Drawdown and Management | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Clear and Grub Site Preparation | 1 | acre | $10,000.00 | $10,000.00 | Construction |
| Excavation and Removal of Existing Overflow Conduit and Appurtenances | 1 | lot | $100,000.00 | $100,000.00 | Construction |
| Spillway Erosion Repair with Riprap | 1 | lot | $190,000.00 | $190,000.00 | Construction |
| Estimated Bid Value | $325,000.00 | ||||
Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.