Mark Twain NF Beaver Lake Dam Rehabilitation

Estimated Value: $325,000
Open 10 days left Washington DCConstructionrfp
Jul 10, 2026
Jul 20, 2026 4:00 PM
Construction
rfp
237310
AI Summary
This bid is for the rehabilitation of the Beaver Lake Dam at Mark Twain National Forest, involving water level management, site clearing, removal of existing overflow structures, and spillway erosion repair with riprap.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Water Level Drawdown and Management 1 lot $25,000.00 $25,000.00 Construction
Clear and Grub Site Preparation 1 acre $10,000.00 $10,000.00 Construction
Excavation and Removal of Existing Overflow Conduit and Appurtenances 1 lot $100,000.00 $100,000.00 Construction
Spillway Erosion Repair with Riprap 1 lot $190,000.00 $190,000.00 Construction
Estimated Bid Value$325,000.00

Want the full details?

Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.

📎 12363N26Q4161_RFQ_Amendment_2.pdf View
📎 Questions_and_Answers_for_Solicitation_12363N26Q4161.docx View
📎 FP-14.pdf View
Sign Up Free →

Related Bids

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids