| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Crushed Aggregate Base Course (e.g., Class 5 or similar) | 500 | ton | $40.00 | $20,000.00 | Construction |
| Washed Gravel (e.g., 3/4 inch minus) | 300 | ton | $45.00 | $13,500.00 | Construction |
| Crushed Rock (e.g., 1/2 inch minus for surfacing) | 200 | ton | $50.00 | $10,000.00 | Construction |
| Geotextile Fabric (non-woven, heavy-duty) | 5000 | square yard | $2.50 | $12,500.00 | Construction |
| Timber for Trail Structures (e.g., treated lumber, various sizes) | 5000 | board foot | $1.50 | $7,500.00 | Construction |
| Culverts (various diameters and lengths, e.g., HDPE or corrugated metal) | 10 | each | $500.00 | $5,000.00 | Construction |
| Trail Markers/Signage (e.g., durable plastic or metal) | 50 | each | $75.00 | $3,750.00 | Other |
| Erosion Control Blankets/Wattles | 1000 | linear foot | $3.00 | $3,000.00 | Construction |
| Delivery of Trail Materials (various locations) | 1 | lot | $75,000.00 | $75,000.00 | Transportation |
| Estimated Bid Value | $150,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.