| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Site Preparation (clearing, grading, excavation) | 1 | lot | $500,000.00 | $500,000.00 | Construction |
| Paving and Surfacing (asphalt/concrete for range and access roads) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Drainage Systems (culverts, storm drains, erosion control) | 1 | lot | $300,000.00 | $300,000.00 | Construction |
| Fencing and Security Barriers | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Utility Infrastructure (electrical, water, communication lines) | 1 | lot | $400,000.00 | $400,000.00 | Construction |
| Small Support Buildings/Shelters (e.g., observation post, storage) | 2 | each | $200,000.00 | $400,000.00 | Construction |
| Specialized Recovery Range Features (e.g., obstacles, simulated terrain, anchor points) | 1 | lot | $1,500,000.00 | $1,500,000.00 | Construction |
| Lighting Systems (for night operations) | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Environmental Controls and Mitigation | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Project Management and Engineering Services | 1 | lot | $400,000.00 | $400,000.00 | Professional Services |
| Estimated Bid Value | $5,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 2 documents, contracting-officer contacts and AI response outlines.