| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Fuel Dispenser (Commercial Grade, Dual Hose, Multi-Product) | 1 | each | $15,000.00 | $15,000.00 | Construction |
| Underground Fuel Storage Tank (Double-Wall, 10,000 Gallon Capacity) | 1 | each | $30,000.00 | $30,000.00 | Construction |
| Fuel Management System (Hardware and Software) | 1 | lot | $10,000.00 | $10,000.00 | IT Hardware |
| Underground Piping and Conduit (Fuel Lines, Electrical) | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Fuel Dispenser Island and Concrete Pad | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Electrical Wiring and Components (Power, Lighting, Safety) | 1 | lot | $7,000.00 | $7,000.00 | Construction |
| Environmental Compliance and Safety Equipment (Spill Containment, Sensors) | 1 | lot | $5,000.00 | $5,000.00 | Facilities |
| Permitting, Engineering, and Design Services | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Site Preparation, Excavation, and Backfill | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Installation, Testing, and Commissioning Services | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| Estimated Bid Value | $125,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 4 documents, contracting-officer contacts and AI response outlines.