| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Component Spray Booth (Industrial Grade, Downdraft, Heated) | 1 | each | $150,000.00 | $150,000.00 | Construction |
| Demolition and Removal of Existing Spray Booth | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| HVAC System Modifications and Installation (Ductwork, Exhaust Fans, Air Make-up Units) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Electrical System Upgrades and Installation (Wiring, Lighting, Control Panels) | 1 | lot | $40,000.00 | $40,000.00 | Construction |
| Fire Suppression System Integration and Installation | 1 | lot | $20,000.00 | $20,000.00 | Construction |
| General Construction and Finishing Work (Flooring, Walls, Sealing) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Project Management and Engineering Services | 1 | lot | $25,000.00 | $25,000.00 | Professional Services |
| Estimated Bid Value | $350,000.00 | ||||