HELENA NATIONAL FOREST - Solar System Install on Existing Well

Estimated Value: $35,000
Archived UtahConstructionrfp
This bid is closed — responses were due August 6, 2026. It is no longer accepting submissions. We keep closed bids on BidsNexus for reference: agencies often re-issue the same need, and past bids show what they buy and when.
See open bids like this one ↓ · Browse open bids in Utah →
Jul 24, 2026
Aug 6, 2026 10:00 PM
Construction
rfp
238210
AI Summary
This bid is for the installation of a solar system on an existing well at the Helena Lewis & Clark National Forest. Bidders are required to attend a scheduled site visit on Wednesday, July 29th at 9:00 AM, meeting at the Townsend Ranger District in Townsend, MT. The deadline for proposals is August 6, 2026, at 10:00 PM.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Solar System Installation on Existing Well 1 lot $25,000.00 $25,000.00 Construction
Solar Panels (e.g., 300-400W panels) 6 each $300.00 $1,800.00 Energy
Inverter/Charge Controller 1 each $1,500.00 $1,500.00 Energy
Battery Bank (e.g., deep cycle batteries) 4 each $500.00 $2,000.00 Energy
Mounting Hardware and Racking System 1 lot $1,000.00 $1,000.00 Construction
Electrical Wiring, Conduit, and Safety Disconnects 1 lot $1,200.00 $1,200.00 Construction
Project Management and Engineering Services 1 lot $2,500.00 $2,500.00 Professional Services
Estimated Bid Value$35,000.00

Want the full details?

Sign up free to see the agency name and the original bid posting link. Pro adds the 9 documents, contracting-officer contacts and AI response outlines.

📎 Attachment2_-_Specification_Exhibits.pdf View
📎 Attachment3_-_MagpieWellLocation.pdf View
📎 Attachment6_-_ShepsHightlifterCoversionTopo.pdf View
+6 more
Sign Up Free → Already have an account? Log in

Browse More Bids

Bids in UtahConstruction BidsRFP BidsClosing Soon All Bids