| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Flashing Beacon System (including pole, mast arm, signal heads, controller, wiring, and foundation) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| All-Way Stop Signage (R1-1 Stop signs, R1-3 All-Way plaques, posts, and hardware) | 4 | each | $500.00 | $2,000.00 | Construction |
| Pavement Markings (stop bars, crosswalks, lane lines as needed for all-way stop) | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Electrical Service Installation (utility connection, conduit, wiring for beacon) | 1 | lot | $10,000.00 | $10,000.00 | Construction |
| Traffic Control during Construction | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Site Preparation and Restoration (excavation, backfill, minor grading, cleanup) | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Engineering and Design Services (if not already completed) | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Project Management and Supervision | 1 | lot | $10,000.00 | $10,000.00 | Professional Services |
| Estimated Bid Value | $125,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds contracting-officer contacts and AI response outlines.
Sign Up Free → Already have an account? Log in