| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Existing Pavement Removal | 1 | lot | $15,000.00 | $15,000.00 | Construction |
| New Pavement Installation (Asphalt/Concrete) | 1 | lot | $60,000.00 | $60,000.00 | Construction |
| Drainage Inlets | 4 | each | $1,500.00 | $6,000.00 | Construction |
| Corrugated Steel Pipes (CSP) for Drainage | 1 | lot | $8,000.00 | $8,000.00 | Construction |
| Concrete Curb and Gutter Installation | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Site Preparation and Earthwork | 1 | lot | $11,000.00 | $11,000.00 | Construction |
| Estimated Bid Value | $125,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 7 documents, contracting-officer contacts and AI response outlines.