| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Engineering Services for Precision Guided Munitions Facility | 1 | lot | $5,000,000.00 | $5,000,000.00 | Professional Services |
| Site Preparation and Earthwork for Facility Construction | 1 | lot | $2,000,000.00 | $2,000,000.00 | Construction |
| Construction of Main Facility Building (including specialized storage and handling areas) | 1 | lot | $40,000,000.00 | $40,000,000.00 | Construction |
| HVAC Systems for specialized munitions storage (temperature and humidity control) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Electrical Systems and Power Distribution (including backup power) | 1 | lot | $4,000,000.00 | $4,000,000.00 | Construction |
| Fire Suppression and Detection Systems (specialized for munitions facilities) | 1 | lot | $2,500,000.00 | $2,500,000.00 | Construction |
| Security Systems (access control, surveillance, intrusion detection) | 1 | lot | $3,500,000.00 | $3,500,000.00 | Security |
| Specialized Material Handling Equipment (cranes, forklifts, conveyors for munitions) | 1 | lot | $5,000,000.00 | $5,000,000.00 | Facilities |
| IT Infrastructure and Network Cabling for Facility Operations | 1 | lot | $1,500,000.00 | $1,500,000.00 | IT Hardware |
| Environmental Control and Monitoring Systems | 1 | lot | $1,000,000.00 | $1,000,000.00 | Facilities |
| Roads, Paving, and Site Utilities (water, sewer, storm drainage) | 1 | lot | $3,000,000.00 | $3,000,000.00 | Construction |
| Project Management and Construction Oversight Services | 1 | lot | $4,500,000.00 | $4,500,000.00 | Professional Services |
| Estimated Bid Value | $75,000,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 3 documents, contracting-officer contacts and AI response outlines.