| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Asphalt Pavement Repair (Pothole/Patching) | 5000 | square yard | $45.00 | $225,000.00 | Construction |
| Asphalt Overlay (2-inch thick) | 10000 | square yard | $30.00 | $300,000.00 | Construction |
| Crack Sealing (Asphalt) | 15000 | linear foot | $3.00 | $45,000.00 | Construction |
| Pavement Marking (Striping, Arrows, Handicap Symbols) | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Concrete Curb and Gutter Repair/Replacement | 500 | linear foot | $80.00 | $40,000.00 | Construction |
| Drainage System Cleaning and Repair (Catch Basins, Storm Drains) | 1 | lot | $35,000.00 | $35,000.00 | Construction |
| Site Preparation and Demolition (Existing Pavement Removal) | 1 | lot | $75,000.00 | $75,000.00 | Construction |
| Aggregate Base Course Installation/Repair | 2000 | cubic yard | $75.00 | $150,000.00 | Construction |
| Traffic Control and Safety Measures | 1 | lot | $25,000.00 | $25,000.00 | Construction |
| Project Management and Supervision | 1 | lot | $100,000.00 | $100,000.00 | Professional Services |
| Mobilization and Demobilization | 1 | lot | $50,000.00 | $50,000.00 | Construction |
| Contingency for Unforeseen Conditions | 1 | lot | $150,000.00 | $150,000.00 | Other |
| Estimated Bid Value | $1,250,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 10 documents, contracting-officer contacts and AI response outlines.