This bid is for the reconstruction of a trestle pier at the James River Reserve Fleet, involving the demolition and disposal of degraded decking and framing, preservation of existing pilings, and subsequent reconstruction.
Line Items
Item
Qty
Unit
Est. Unit Price
Est. Total
Category
Demolition and Disposal of Degraded Trestle Pier Decking and Uneven Walkway Framing
1
lot
$300,000.00
$300,000.00
Construction
Preservation of Existing Structural Pilings (Trestle Pier)
1
lot
$200,000.00
$200,000.00
Construction
Reconstruction of Trestle Pier (Decking and Walkway Framing)
1
lot
$1,000,000.00
$1,000,000.00
Construction
Estimated Bid Value
$1,500,000.00