| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Design and Engineering Services for Recirculating Aquaculture Systems (RAS) | 1 | lot | $250,000.00 | $250,000.00 | Professional Services |
| Construction of Recirculating Aquaculture Systems (RAS) Infrastructure (tanks, plumbing, filtration housing, etc.) | 1 | lot | $1,000,000.00 | $1,000,000.00 | Construction |
| Water Filtration Equipment (mechanical filters, biofilters, UV sterilizers, ozone generators) | 1 | lot | $500,000.00 | $500,000.00 | Other |
| Pumping Systems and Associated Plumbing | 1 | lot | $200,000.00 | $200,000.00 | Construction |
| Aeration and Oxygenation Systems | 1 | lot | $150,000.00 | $150,000.00 | Other |
| Water Quality Monitoring and Control Systems (sensors, controllers, alarms) | 1 | lot | $100,000.00 | $100,000.00 | IT Hardware |
| Electrical Systems and Controls for RAS | 1 | lot | $150,000.00 | $150,000.00 | Construction |
| Installation and Commissioning Services for RAS | 1 | lot | $150,000.00 | $150,000.00 | Professional Services |
| Estimated Bid Value | $2,500,000.00 | ||||
Sign up free to see the agency name and the original bid posting link. Pro adds the 2 documents, contracting-officer contacts and AI response outlines.