GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF

Estimated Value: $1,500,000
Open 27 days left Washington DCConstructionrfp
Aug 4, 2026
Sep 30, 2026 9:00 PM
Construction
rfp
238990
AI Summary
This bid is for the rehabilitation and safety upgrades of the Dripstone and Discovery Trail infrastructure within the Blanchard Springs Caverns, including all necessary labor, equipment, supplies, testing, and inspections.
Line Items
ItemQtyUnitEst. Unit PriceEst. TotalCategory
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure Repairs and Safety Upgrades (Labor) 1 lot $750,000.00 $750,000.00 Construction
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure Repairs and Safety Upgrades (Equipment) 1 lot $300,000.00 $300,000.00 Construction
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure Repairs and Safety Upgrades (Supplies) 1 lot $250,000.00 $250,000.00 Construction
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure Repairs and Safety Upgrades (Testing & Inspections) 1 lot $100,000.00 $100,000.00 Professional Services
Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure Repairs and Safety Upgrades (Incidentals) 1 lot $100,000.00 $100,000.00 Construction
Estimated Bid Value$1,500,000.00

Want the full details?

Sign up free to see the agency name, 12 documents, contact info, and the original bid posting link.

📎 C04_SF1442_1240BH26R0013.pdf View
📎 C04b_Attachment_2__Specs_BSC_LH_1240BH26R0013.pdf View
📎 C04d_Attachment_4_Dwgs_BSC_Handrails_1240BH26R0013.pdf View
+9 more
Sign Up Free →

Related Bids

Browse More Bids

Bids in Washington DCConstruction BidsRFP BidsClosing Soon All Bids