| Item | Qty | Unit | Est. Unit Price | Est. Total | Category |
|---|---|---|---|---|---|
| Playground equipment repair/replacement (e.g., swings, slides, climbing structures) | 1 | lot | $30,000.00 | $30,000.00 | Construction |
| Safety surfacing repair/replacement (e.g., rubber mulch, poured-in-place rubber) | 2000 | sq ft | $15.00 | $30,000.00 | Construction |
| Site preparation and cleanup | 1 | lot | $5,000.00 | $5,000.00 | Construction |
| Labor for installation and repair | 100 | hour | $100.00 | $10,000.00 | Construction |
| Estimated Bid Value | $75,000.00 | ||||
Sign up free to see the agency name, 3 documents, contact info, and the original bid posting link.